clearly number from MS Project

  • 1
  • Idea
  • Updated 1 month ago
  • (Edited)
In big schedules there are often tasks with the same name.
For this in MS Project every task gets a clearly number. By the transfer from MS Project through MM 2020 I'm missing this important number in the map.

Is it possible to integrate this clearly number in the transfer from MS Project through MM ?

In additional, it would be great to generate automatically a new tag group "clearly number" with all import clearly numbers in the map and automatically every task gets as a TAG with his clearly number.
    
Photo of Jörg

Jörg

  • 70 Posts
  • 13 Reply Likes
  • new idea

Posted 1 month ago

  • 1
Photo of Andreas Lercher

Andreas Lercher

  • 56 Posts
  • 26 Reply Likes
You can turn on the numbering in MindManager and freeze it in the map properties.
I did a video höre it works for my new master class.
Can share the video with you
Photo of Jörg

Jörg

  • 70 Posts
  • 13 Reply Likes
With clearly number I mean the number inside MS Project, if I understand right you mean the numbering in Mindmanager but thats different things.


Photo of Andreas Lercher

Andreas Lercher

  • 56 Posts
  • 26 Reply Likes
That is an idea for the beta test
Photo of Jörg

Jörg

  • 70 Posts
  • 13 Reply Likes
thats a good idea
Photo of Alf Christophersen

Alf Christophersen

  • 69 Posts
  • 9 Reply Likes
That maybe is a key which make it possible to synchronize bidirectionally ??
What else lacks for that ?
Photo of Jörg

Jörg

  • 70 Posts
  • 13 Reply Likes
with the clearly number it's easier to discuss about the right task, 
in a big schedules are a lot of tasks with the same name.

...and yes you are right maybe it's possible with this clearly number to synchronize changes from MS Project through MM - like e-mails, tasks,... in outlook
Photo of Alf Christophersen

Alf Christophersen

  • 69 Posts
  • 9 Reply Likes
In a database, a unique primary key always identifies each project so if visible, it should be used to identify also the local, or at least be stored in the MM project in order to update original, or upgrade copy if origin is in MM
Photo of Andreas Lercher

Andreas Lercher

  • 56 Posts
  • 26 Reply Likes
In which business case would I need to sync project and MindManager?
Either my project is so big that I have to take project, or I continue to work with MindManager.
I didn't see a need to switch between both tools
Photo of Jörg

Jörg

  • 70 Posts
  • 13 Reply Likes
a schedule plan in the world of building chemical plants is a plan how the things will/must be done at the start of the project for thousands of tasks.
I know no project which would be done exactly by this start schedule.

So if you use Mindmanager for the detailed accompaniment of the singel tasks with e-mails, etc. its very important to synchronize changes from project through Mindmanager.
Photo of Andreas Lercher

Andreas Lercher

  • 56 Posts
  • 26 Reply Likes
Thank you Jörg. Understand
Photo of Jörg Becker

Jörg Becker

  • 1 Post
  • 0 Reply Likes
Only one way sync....from Projct through Mindmanager