Push CoHuman tasks to Connect

  • 4
  • Idea
  • Updated 6 years ago
  • Planned
Just like the Outlook Linker in MindManager, I would like to pull a list of my top tasks within Connect Vision as well as tasks for a project etc.

Basically it's an inversion of the "Send to Action" functionality.
Photo of Antonio Gonzales

Antonio Gonzales

  • 11 Posts
  • 1 Reply Like

Posted 6 years ago

  • 4
Photo of Scott Gilbert

Scott Gilbert

  • 157 Posts
  • 6 Reply Likes
we are in fact looking at doing just this and much more as we bring Vision and Action together into a single application where we provide different ways to view and act on your projects and tasks.
Photo of Gordon Tibbitts

Gordon Tibbitts

  • 1 Post
  • 0 Reply Likes
You can stub tasks from Action on a Vision map. These can be related to tasks in Action if there is one (and then place on the Vision map with a code of some kind to indicated the need for "placement approval").
You can merge Vision Map tasks into Action (when a task has already been shared). All data that does not overlay can be added. Tasks metadata should be normalized so that (dates, flags, and other characteristics of the task) are always in sync between Action and Vision. The only case you get in trouble is deletion. I suggest versioning. Subordinate older information by date.
Vision maps should be assignable to Projects
Tasks originated in Action that flow back to Vision can either be stubbed in (where there is a Project but no hierarchical relationship) or added to the sub-task if associated in Action (ie a new task is a sub-task of a task that is already associated with a Vision Map).
Please don't hesitate to ask me on how to solve this stuff. I might be able to help you. I like your product and want to make the company I am running more productive. With a tighter coupling I can add a lot more users.